> Home    > Our Projects    > Masjed-e Soleyman Dam
Middle East, Iran

Masjed-e Soleyman Dam

The Masjed-e Soleyman Dam is located on Iran’s Arvand River, 25 km from the town of Masjed-e-Soleyman. Its maximum capacity is 2,000 MW and it generates 3,700 GWh annually.

Installed System(s) :

DELUGE SYSTEM

Project timeline :

2004 to 2005
New search Back to search results